Level 3 – Sanitary & Drainage Systems
in Gcat Academy Advance 2
Created by
Administrator
About this course
Covers complete installation of sanitary systems (toilets, washbasins, bathtubs), floor and roof drainage, hot water systems, pumps, sewerage, and water treatment. Includes technical drawing and advanced calculations.
Advance 2 Study Time -
http://www.gcat.academy/Docs/Basic_Study_Time.docx
Comments (0)
Floor Drainage
2 Parts
- 2:00 Hr
Floor Drainage
Floor Drainage
60 Min
Attachments:
Shower Channels
Shower Channels
60 Min
Attachments:
Bathroom
4 Parts
- 4:00 Hr
Washbasins
Washbasins
60 Min
Attachments:
Bathroom Dimensions Movement
Bathroom Dimensions Movement
60 Min
Attachments:
Pre Wall Modular Basic
Pre Wall Modular Basic
60 Min
Attachments:
Modular Elements Installation
60 Min
Attachments:
0
0 Reviews