Level 2 – Water Systems & Pipework Installation
in Gcat Academy AdvanceAbout this course
Covers installation of water pipes, drilling in different materials, pipe connections, valves and fittings, corrosion and scaling, as well as water properties, drawing interpretation, and applied mathematics.
Comments (0)
Time Table
Detachable Connections
Different Pipes
Glueing
How to Seal a Thread Tape
Non Detachable Pipe Connections
Suspension Fixing of Pipes
Valves & Fittings
Working with Pex Pipes
Drilling into Different Materials and Substrates
General information on fastening pipes
Detachable Pipe Connections
Non Detachable Pipe Connections (See also chapter 7,8 and 9)
Pipe Material and Connection
Connex Compression Fittings
Cut Prepare Copper Pipe For Press - Solder Fitting
Explain Different Pex Pipes
Pressure Test Water Pipes
Solder Copper Pipe
Compression Fittings
Solder Soft Brazing
Press Technology Metal Pipe
Part 1 Copper Pipe Installation (Copper)
Part 2 Copper Pipe Installation (Tools)
Part 3 Copper Pipe Installation (Bending)
Part 4 Copper Pipe Installation (Soldering)
Water Pipe Laying Rules
Why Dimension Drinking Water Pipes
Calculation Water Supply Pipes
Insulation of Drinking Water Pipes
Filling, Flushing, Pressure Test, and Commissioning
Pressure Test According to DIN 1988-2
Pressure and Pressure Areas
Water Types and Qualitiy
Drinking Water and Its Properties
Risks in Potable Water Installation
Drinking Water (DIN EN 806-1)
Water Production and Supply
Protective Measures for the Installation of Pipes and Facilities
Corrosion and Protective Measures in the Sanitary Trade
Stone Setting
Water Meter & Fittings
Extraction Fittings
Pipe Fittings
Safety Fittings
Symbols for Water Supply and Disposal
Symbols South Africa
Sound & Noise
(8 to 9 hours, ideally split across 2–3 workshop days)
390 – 480 minutes (can be split over 2–3 workshop days)
Fabricating Brackets from Equal-Angle Steel
Fabricating a Water Distribution Manifold
Total Estimated Learning Time: 480–540 minutes
(8 to 9 hours, ideally split across 2–3 workshop days)
Installing a Gas Distribution System
Total Estimated Learning Time: 420–480 minutes
(7 to 8 hours, ideally split across 2 workshop days)
Fastening, Drilling, and Planning Pipe Assemblies
Total Estimated Learning Time: 540–600 minutes
(9 to 10 hours, ideally split across 2–3 workshop days)
Maintenance of a Membrane Safety Valve
Total Estimated Learning Time: 360–420 minutes
(6 to 7 hours, ideally split across 1–2 workshop days)
Offer Preparation and Business Structure
Total Estimated Learning Time: 360–420 minutes
(6 to 7 hours, ideally split across 1–2 workshop days)
Repairing a Circulation Pump and Testing a Flow Temperature Sensor
Total Estimated Learning Time: 480–540 minutes
(8 to 9 hours, ideally split across 2 workshop days)
Bilingual Overlay Table
Advance 1 Maths
Maths first apprentice year
Symbols in Heating Systems
Symbols for Water Supply & Disposal
Why Technical Drawings Matter for Plant Mechanics & Plumbers
Line Types and Sectional Views in Technical Drawings
Pipe Line Types, Colors, and Dimensions in Technical Drawings
Reference Levels and Dimensions in Technical Drawings
Module 5: Key Drawing Skills for Apprentices
Module 6: Plumbing Symbols for Water Supply and Disposal